What a difference a day makes!! Thankfully the weather was great today and the site has dried out well. We have been able to catch up on the planned geophysical work before the JCB work tomorrow. So resitivity and magnetometry has been finished on the main villa and second smaller building. Trenches are marked out for the JCB on the buildings too. Everyone has had a chance to try out the different pieces of equipment and got excellent results. So providing the weather is as forecast tomorrow, we shall be able to start digging the buildings on Saturday and processing finds. It’s been lovely working on the site today in the sunshine – it is a beautiful site with spectacular distant views set at the top of a lovely valley. You can see why the Romans picked the spot!